top of page
Macclesfield NHS
“In late August 2014, Ecolite completed a 2,900 Generation 2 LED installation and from this time we have been impressed with the savings we have seen, and the absence of maintenance – we have had no failures! Ecolite’s approach to making LED gear trays enabled us to maximise the savings we have seen as areas not possible to convert, were then made possible, such as theatres, mortuary and aseptic suite.”
Laurence Edwards, Engineering Manager, Macclesfield District General
1/4
bottom of page